Quite a bit has already
been done at Camp McFadden. See the Accomplishments page.
The camp was completely
overgrown when work started. It is now very usable. Go take a
look. You will be
amazed..........
See the Layout & Location page for directions.
We have a set workday
every month. It is the Saturday after
the second Tuesday of the month.
The list of things that
still need to be done is rather lengthy. You can help.
Look over the list and
see if there isn't something that you could help with. When you find it,
simply call the Camp McFadden number, 580-762-9955, and let them know
the item you are interested in helping with.
Some
projects need one more person. Believe in the power of one.
You are one. Your group, business, organization, or family is one.
Have a bonding experience with your family
or group.
While doing a project you can develop
friendships, learn new skills, make a direct impact, use your creative skills,
try something new, choose what you want to do, and work at your pace.
You can make a difference and get the
feeling of satisfaction by helping the community.
Pick a project and call now: 580-762-9955
If you do not have
time or are not able to physically help with projects, that is ok. All some projects need is the money to buy
the materials. A donation is just as
good. You can mail donations to:
Camp
McFadden
PO Box 1495
Ponca City, OK 74602-1495
Or do you have
items you no longer need or use. Call
and donate them to the Camp. We will
come pick them up.
Need a tax
break? We will give you a receipt so
you can take your donated items off your taxes as a contribution.
Just call 580-762-9955.
Your help is
greatly appreciated. THANK YOU.
The Camp needs a reliable tractor w/pto. Your donation is tax deductible.
Camp
McFadden Projects
Note: The last entry
for a project is the status of that project.
Facilities
- Cabin
1
- Install
insulation and wallboard.
- Lower
screen on front screen door needs repair.
- Lower
screen on back screen door needs repair.
- Dead
bolt on back wood door needs adjusting.
- Cabin
2
- Install
a wood door (32 x 80) on front.
- Install
insulation and wallboard.
- Dead
bolt on back wood door needs adjusting.
- Cabin
3
- Install
insulation and wallboard
- Back
screen door doesn’t latch.
- SW
window screen needs repair.
- Cabin
4
- Install
insulation and wallboard
- Cabin
5
- Install
insulation and wallboard
- Cabin
6
- Repair/replace
the east porch light.
- Install
insulation and wallboard.
- Front
wood door needs work.
i.
Board under the window is loose.
ii.
Door doesn’t latch well.
- Trim
bush and weeds at NW corner.
- Cabins
(general)
- Obtain
mattress covers for all the mattresses in the cabins.
i.
Status - The number of each
kind and the measurements were sent to Sharon.
- Ceiling
fans for cabins.
i.
8/12/06 – 6 ceiling fans replaced. All have at least one working fan.
- Fire
extinguishers for the cabins.
- Remove
homemade fire rings from in back of the cabins.
- Put
numbers on the rear of the cabins.
- Put
lockers in the cabins. Renters
would provide their own padlocks, if desired.
- First
Aid cabin (transform into a 2 bedroom apartment)
- Electrical
i.
Remove old breaker box.
ii.
Install new breaker box.
iii.
Add a few additional circuits.
iv.
Run a bigger feed to the breaker box.
1. Status – New box was installed, but needs to be reset
out ¾” and a new door found and
installed.
- Windows
i.
Install new window in the East end.
- Plumbing
i.
Rough in the inside plumbing
ii.
Attach to the existing water line (unusual fitting).
iii.
Install water heater.
iv.
Resolve tub or shower situation.
- Ceiling
i.
After the electrical is done:
1.
Install insulation for ceiling
2.
Install ceiling
- Walls
i.
After the electrical is done:
1.
Install insulation for walls.
2.
Install wall panels.
3.
Paint
- Heating
i.
???
- Air
Conditioning
i.
Install window units
- Install shades and curtains.
- Install
metal roof – The Latter Day Saints youth group will do the first part of
July
- Nature
Center - Sharon
- Repair
exterior boards.
i.
Status - Supplies have been
purchased to repair the exterior boards
ii.




- Paint the exterior - Vicki Means and Robbie Powell
- Build
steps for the back doors.
- Install
crawl space doors and screens.
- Clean
out junk inside of Nature Center.
i.
Status: Progress was made during the March 06
workday. West side is clear.
- Paint
interior
- Other
interior repairs
- Fix
or replace back doors.
- Bathhouse
- Men’s
side
i.
Obtain and repair sheetrock.
ii.
Outside door needs a knob on the outside.
iii.
Put new anchors in wall and reattach second sink from East
end.
iv.
Repair/remove/replace far left soap dispenser.
v.
Repair ceiling damage from leak.
- Women’s
side
i.
Put new anchors in wall and reattach third sink from East end
– needs new sink.
ii.
Stop toilet #2 from constant running.
iii.
Fix fluorescent light.
- Replace/repair
light fixture over the outside doors.
- Reseal
skylights.
- Replace
latches on 6 stalls.
- Replace
valves on toilets that do not work properly.
- Put
back railroad ties around bathhouse/or remove them.
- Lodge
- Install
ceiling and insulation in the kitchen part of the lodge (drop ceiling).
- Install
ceiling and insulation in the office part of the lodge (drop ceiling).
- Fix
leak in AC in main room.
i.
I found a note of Sharon’s that says the AC unit needs to be
lifted up.
- Repair/Replace
counter top in Kitchen.
- Haul
off the pop box.
- Repair/replace
the exhaust fans in the outside toilets.
- Repair/replace
light fixture in men’s toilet.
- Re-nail
board under the overhang on the southwest end of the front.
- Replace
attic vent. Old one is 8 x 16 and
new one should be 8 x 20.
i.
Was covered with plywood.
- Obtain
and install ceiling fans.
- Haul
off the patio freezer.
- Put
closers on the bathroom doors on the outside of the lodge.
- Obtain
bench seats for the lodge windows.
- Repair/obtain
a new icemaker for the lodge.
- Need
screens
i.
North end 2nd window from west.
ii.
Office area
1.
No screens on North side (3)
2.
No screen on 2nd window from west on South end.
- Swimming
pool
- Cut
down tree on south side of pool.
i.
Dropping too much trash into the pool.
- Obtain
a cover for the pool.
- Repair
the deck.
- Build two handicapped cabins -
Ambucs
- Work
is progressing – see more details here
- Install
a new transformer and meter for the electric feed for the First-Aid cabin
and the handicapped cabins.
- Ben
will contact Kay Electric at the appropriate time.
- Build
2 full hookup sites for camp hosts like at the Corps areas.
- Best
place to make the hookups would be just north of the Nature Center.
- Could
use the dirt from the hill across from the south end of the Nature
Center.
i.
This small hill needs to be moved anyway.
- Build
a picnic pavilion. This would be a large group area.
- Put
roof on poles for archery range.
- Build
a ramp to the equipment shed so equipment can be rolled in and out.
- RV
sites;
- Upgrade
the RV sites to be individual sites with water and electric on poles.
i.
Mark individual RV sites.
Suggestion: Use Cedar trunks to
mark.
ii.
Install water to each site
iii.
Install electric to each site.
- Add
additional RV sites.
- Number
the sites.
- Add
the plumbing to the facilities layer of the map.
- Water
i.
Some locations are identified and on
the map. - Darryl
- Sewer
i.
Some locations are identified
and on the map. - Darryl
- Obtain
signs saying Leased by Camp McFadden to place on the Corps leased land.
- Should
state it is Camp McFadden Lease, No Firearms, No Hunting, No Fireworks,
and to see all the regulations at the main gate.
i.
At public access points on Hartford
ii.
Two facing Kaw Lake.
- A new
front gate sign.
- Not
sure what is meant by this. Who
can explain?
- Put
cigarette butt containers by each cabin, bathhouse, and several places
around the lodge.
- New
secure storage/work area for all camp equipment (tractor, lawn mowers,
weed eaters, tools, tractor accessories, etc.).
- Trash
- Get
another dumpster for trash.
i.
Place where both cabins and RVs could use it.
- Lodge
dumpster
i.
Build a fence around the dumpster so it looks better.
ii.
Block the back and sides of the pad so the trash receptacle
can’t roll off.
- Now
have weekly trash pickup
- Get
latrines on both ends of the property.
- Fox
Den
- Make
tent camping sites around the shelter.
- Move
picnic tables back up to shelter.
i.
The shelter now has a new
roof and the fireplace has been cleaned and is usable.
- Have
water installed at the Ropes course.
- Make
an inventory of items in each building.
- Repair
brick fire pit southeast of the lodge.

- Clean,
check, and paint the storm shelters.
- Install
a new water meter on Hartford and run the water line in to the camp.
- Install
water cutoff valves in the camp area for each outlet.
- Main
line in to cabin area
- Line
to bath house
- Line
to lodge
- Line
to first aid cabin
- Line
to nature center
- Line
to trailer house
- Line
to barn
- Line
to corral
i.
Status: The main water line has been found at the bottom of the hill.
Grounds
- Obtain
commercial lawn equipment for maintaining the grounds.
- Erosion
control on several of the streams that go under the road.
- The
first creek into the camp has already blocked one of the culverts.
i.
More dirt has also been washed down.
ii.
May need to work on the water flow / put rocks in creek.
- Repair
the bridge on the Nature trail by the fishing pond.
- Have
bridge tested for capacity after repair?
i.
There is a new pole lying
by the bridge.
- Should
this be redesigned with large culverts under a dirt road so vehicles can
drive to the fishing pond for handicapped access?
i.
Can the three large pipes
lying at the south end of the Ropes / East side of Obstacle course be used for
culverts?
- Get
the barn and corral into usable condition.
- Put
new roof on corral shed.
- Paint
corral shed.
- Clean
area around barn and corral.
- Clean
out barn so it can be used to work on and store equipment.
- Obtain
and replace windows in barn (with Facilities).
i.
Filled a large dumpster with metal in March 06 and sold it for
metal.
- Remove
all obstacles in areas where the brush hog is used so nothing is hit with
the blades.
- Remove
rocks in ground on both sides of the bathhouse so areas can be brush
hogged.
- A lot of the rocks have been piled up.
- Remove
stumps on east side of low spot north of cabins.
- Remove
trees and terrace at the bottom of the hill below the lodge so water will
go to the lake and not stand in the Lake trail.
- Parking
- Make
parking areas at the cabins.
i.
Parking areas would have defined boundaries, like railroad
ties or maybe trunks from Cedar trees.
We have a good supply of those.
ii.
Obtain gravel for new area.
- Add
a parking area on the north side of the lodge.
i.
There is not enough room on the south side for large groups
just renting the lodge.
ii.
We are also going to have activities there and need parking
for them.
iii.
Parking areas would have defined boundaries, like railroad
ties or maybe trunks from Cedar trees.
We have a good supply of those.
iv.
Obtain gravel for new area.
- Add
defined boundaries to the parking on the south side of the lodge
- Make
a parking area at the end of the Creek trail by the road into the camp.
- Trails
–
- Eagle scout project waiting approval. The contact is Dan Brandenburger.
i.
Make new signs for the trails that are more visible.
ii.
Designate a color for each trail.
iii.
Mark each trail along the way with its color.
iv.
Place you are here signs at various places along the trails.
v.
Clear the Creek Trail from the pond to the road.
vi.
Connect the Creek trail to the ball field area.
vii.
Make a return trail from the northwest corner up over the hill
to the Ropes Course.
- Fix
ruts on Nature Trail going to bridge.
- Make
a trail from the northeast fence line across the hill to connect to the
North 40 or Ropes course trail.
- Spread
wood chips on the trails.
- Canoe
pond
- Clear
around the edge of the pond so people will have access to fish.
i.
Cut the trees around the pond and off the dam.
ii.
Weed eat around the pond and on the dam.
- Repair
the dam.
i.
Put bentonite in beaver holes?
ii.
Use dirt to complete.
- Put
riprap on the repaired dam.
- Fishing
pond
- Clear
around the edge of the pond so people will have access to fish.
i.
Cut the trees around the pond and off the dam.
ii.
Weed eat around the pond and on the dam.
- Repair
the dam.
i.
Drain pond
ii.
Remove as much moss as possible.
iii.
Repair the dam
1.
Put bentonite in beaver holes.
2.
Rebuild washed out area.
iv.
Put riprap on the repaired dam
- Overflow
pond from Canoe pond.
- Cut
trees from the dam and around the pond.
- Weed
eat to allow access to fish.
- Rebuild
a pond on the west side of the road across from the fishing pond. Make a big pond. It is the Sunrise pond for now.
- Move
the pedal boats to this pond.
i.
They could also be used for fishing.
ii.
They wouldn’t float away when the lake gets full.
- Build
a dock on this pond.
- Stock
this pond.
- Trim
low branches at the south end of the corral.
- Obtain
water hoses and sprinklers.
- Post
more No Hunting signs.
- Ongoing:
- Mow
around lodge, cabins, Nature Center, trailer and barn.
- Weed
eat around lodge, cabins, Nature Center, trailer and barn.
- Brush
hog, mow, and weed eat Obstacle and Ropes courses.
i.
Spread wood chips on the Ropes course.
ii.
Spread wood chips on the Obstacle course.
- Brush
hog the sides of the main road.
- Keep
trails clear.
i.
Brush hog trails that are wide enough.
ii.
Weed eat other trails.
- Prepare
for controlled burn. - Darryl
i.
Keep buffers cut so there are places to stop a fire.
1.
Brush hog buffers.
ii.
Weed eat around structures and wood poles.
- Brush
hog and mow the ball field and the road to it.
- Cut
cedar trees.
- Clear
new areas as needed.
- Build
Kaw lake access for launching and loading boats.
- All
weather road to the lake access.
- Drudge
out creek below fishing pond all the way to the lake so water is 4-5 feet
deep with the lake at normal level???
Or
- Check
the possibility of going down north of the ball field area to that creek.
i.
Lake is silted in a lot so may be hard to do.
- Level
the area under the ropes course for the camp users to play baseball,
football, and soccer. Would make
it possible to have sports camps?
- Widen
the main road to two lanes.
- Trash
pick up along Hartford and throughout the camp.
- Trap
and remove unwanted animals.
- Robby
- Remove
tree from fence between the Camp
and Warren's land. It is south of Fox Den and north of the creek.
- Repair/replace the wheels and tires on
the big trailer.
- Designated
tent sites with Activities.
- Clear
new areas for designated tent sites.
i.
Area for tent
ii.
Area for parking
- Create
roads to the designated tent sites.
- Make
an inventory of camp items in barn.
- Was
started 2 years ago.
- Make
an inventory of camp implements.
- Was
started 2 years ago
- Grind
stumps where trees were removed to allow the brush hog to be used in those
areas.
- Burn
downed trees.